Design-to-Field Reconciliation

Reconcile planned routes against field survey data and flag conflicts before crews build the wrong thing.

What It Does

The agent compares the planned route against field survey data, flags conflicts with utilities, terrain, and access, and cites the source for each. An engineer reviews before the design is revised.Without it: Designs are drawn on digital maps, but field teams find obstacles the design never showed. The mismatch surfaces during construction, when it is most expensive to fix.

  • Separates conflicts that move the route from ones a field note resolves
  • Reads utility locate tickets by date, and marks any older than the design
  • Survey points outside GPS tolerance are listed unusable, not scored as conflicts
  • Writes the comparison to a separate review layer, never over the issued design

Illustrative example

Crew 6 returns survey for segment F-14, 1.2 km of planned aerial on the Ridgeway build. The agent lays it against the CAD centerline on a review layer and flags three conflicts: a gas main at station 24+50 sitting two metres off where the design shows it, an access grade the boring rig cannot cross, and a locate ticket dated before the reroute. The design engineer decides which of the three force a redraw.

Reads

GIS

Utility, terrain, access layers

CAD files

Planned route centerline

Field survey

Points returned by crew

Locate tickets

Marked utilities, ticket dates

Runs

Design-to-field reconciliation

Suggest

Starts when

A crew returns field survey data for a designed route segment

How far it goes

it proposes, and a person approves before anything commits

Produces

Route comparison

Written to review layer

Conflict flags

Raised with citations

Revisions

Queued for the engineer

Design-to-field reconciliation. Reads GIS, Utility, terrain, access layers; CAD files, Planned route centerline; Field survey, Points returned by crew; Locate tickets, Marked utilities, ticket dates. Suggest autonomy: it proposes, and a person approves before anything commits. Produces Route comparison Written to review layer; Conflict flags Raised with citations; Revisions Queued for the engineer.

Give Us One Stuck Pilot.

We'll have it in governed production before your next board meeting.