Bill-of-Materials and Report Generation

Generate bills of materials and engineering reports from the design, ready for an engineer to review.

What It Does

The agent reads the design, generates the bill of materials and the required reports, and flags anything that does not reconcile with the route. An engineer reviews before release.Without it: Producing accurate bills of materials and engineering reports by hand from the design is repetitive, and errors flow downstream into procurement.

  • Maps design symbols to catalog part numbers, and flags any symbol with no match
  • Itemizes the slack and waste allowance your standards set, rather than folding it in
  • Parts discontinued in the catalog are listed with the substitution left to a person
  • Priced lines carry the estimating tool's rate and the date it was pulled

Illustrative example

The Callow Road design releases for construction: 2.9 km of trench, 46 handholes, two crossings. The agent builds the bill of materials against the catalog, shows the cable slack allowance on its own line, and raises two flags: a vault symbol on sheet 3 with no catalog part, and a conduit quantity 210 m short of the routed length. The design engineer resolves both before procurement sees the list.

Reads

CAD files

Symbols, routed lengths

Materials catalog

Part numbers, discontinuations

Procurement

Part records the BOM feeds

Cost estimating

Rates and pull dates

Runs

Bill-of-materials and report generation

Suggest

Starts when

A design is released for construction

How far it goes

it proposes, and a person approves before anything commits

Produces

Bill of materials

Generated for review

Engineering reports

Drafted, unreleased

Reconciliation flags

Raised against the route

Bill-of-materials and report generation. Reads CAD files, Symbols, routed lengths; Materials catalog, Part numbers, discontinuations; Procurement, Part records the BOM feeds; Cost estimating, Rates and pull dates. Suggest autonomy: it proposes, and a person approves before anything commits. Produces Bill of materials Generated for review; Engineering reports Drafted, unreleased; Reconciliation flags Raised against the route.

Give Us One Stuck Pilot.

We'll have it in governed production before your next board meeting.