What It Does

At the close of each metering interval, the agent sets meter readings against machine run-time and booked output to show energy and machine hours used per unit produced, by machine and by shift. It lists the periods where energy and running time went in without output coming out, and a person decides what to change.Without it: Energy and utilization data sits unused, so waste continues unnoticed across the floor.

  • Idle-but-powered time is split from running time and from genuine downtime
  • Each machine is set against its own history and its peers on the same product
  • Intervals with a failed meter read are named and excluded, not interpolated
  • Compressed air, lighting and HVAC load is held apart from machine load

Illustrative example

The 06:00 interval closes with 1,840 kWh drawn against 3.1 tonnes booked. Two ring frames sat at near-running power for 90 minutes with no output booked against them, and a third comes out at 0.61 kWh per kg where a peer on the same count runs 0.48. The energy engineer takes both into the maintenance meeting and picks which one to investigate.

Reads

Energy meters

kWh per interval

Run-time records

Running, idle, down

Output records

Booked output per machine

Runs

Energy and utilization analysis

Watch

Starts when

A metering interval closes and consumption data lands

How far it goes

it flags and records, and takes no action itself

Never

CONTROL: enforced below the model, not asked of it

Produces

Waste periods

Flagged per interval

Utilization view

Built by machine, shift

Recovery opportunities

Listed, not actioned

Energy and utilization analysis. Reads Energy meters, kWh per interval; Run-time records, Running, idle, down; Output records, Booked output per machine. Watch autonomy: it flags and records, and takes no action itself. It never control. Produces Waste periods Flagged per interval; Utilization view Built by machine, shift; Recovery opportunities Listed, not actioned.